

Yokogawa ANB10D-425/CU2N ESB Bus Node Units Brand New
Automation does not wait. The Yokogawa ANB10D-425/CU2N is a esb bus node units in our Shenzhen warehouse right now. Suffix Codes: : | -4: Dual-redundant power supply | 1: 100 - 120 V AC power supply. Verified before packing. 12-month warranty.
Technical Specifications
| 1 | 100 - 120 V AC power supply |
|---|---|
| 2 | 220 - 240 V AC power supply |
| 4 | 24 V DC power supply |
| 5 | Basic type with no explosion protection |
| 6 | With ISA Standard G3 option, temperature (-20 ºC to 70 ºC) option, and no explosion protection |
| 7 | With ISA Standard G3 option and no explosion protection |
| ESB Bus Node Unit | has an interface function that communicates the analog I/O signals and contact I/O signals of a field with a Field Control Unit (FCU) via an ESB bus, as well as a function that supplies power to the I/O Modules. This node units are connected to FCU via an ESB bus. |
| Model | ANB10D |
| Suffix Codes | : |
| -4 | Dual-redundant power supply |
| E | Basic type with explosion protection |
| F | With ISA Standard G3 option, temperature (-20 ºC to 70 ºC) option, and explosion protection |
| G | With ISA Standard G3 option and explosion protection |
| Option Codes | : |
| /CU2N | Connector Unit for ESB Bus [part No.: S9562FA (2 pieces)] |
| /CU2T | Connector Unit with Terminator for ESB Bus [part No.: S9564FA (2 pieces)] |
| /ATDOC | Explosion Protection Manual |
| Manufacturer | Yokogawa |
| Model / SKU | ANB10D-425/CU2N |
Ships within 24 hours | 12-Month Warranty | Worldwide Delivery
The ANB10D-425/CU2N: Real-World Reliability
It is always the same story: 2 AM, the control system alarms, and the spare parts cabinet is empty. The Yokogawa ANB10D-425/CU2N — a esb bus node units — is the component that failed. Now you are calling suppliers, hoping someone has stock and can ship today.
That is the scenario we built PLC Parts Direct to solve. We stock the ANB10D-425/CU2N in our Shenzhen warehouse — physically, not virtually. When you order, our team picks it from the shelf, verifies the serial number against the test report, packs it in anti-static packaging, and hands it to DHL. You get a tracking number, not a processing status that drags on for weeks.
What you are getting: model: ANB10D; suffix codes: :; -4: Dual-redundant power supply; 1: 100 - 120 V AC power supply. Every unit undergoes multi-point functional verification and 48-hour burn-in at 55°C before shipping. A printed test report is included. For steel manufacturing applications where reliability is everything, we recommend keeping one cold spare of each critical module type. The cost of the spare is negligible compared to the cost of unplanned downtime.
Compatible Parts — Same System
These modules share the same system family as the ANB10D-425/CU2N. Commonly ordered together for complete rack builds or spare parts kits.
Related Products